Granny flat questions, answered
The questions we hear most about granny flats and garden homes, from the 32–45 m² planning exemption to renting, finance and the build itself. Every answer links to the detail, and your own site is always confirmed at a free, no-obligation visit.
S.I. No. 340/2026 · Class 3A
Planning and the exemption
Do I need planning permission for a garden home?
Not if it meets Class 3A of S.I. No. 340/2026. Since 27 July 2026, a detached garden home of 32–45 m² in the rear garden of your main house is exempt, provided at least 25 m² of garden remains, it is at least 0.6 m from any boundary, it has its own access within the garden (no new entrance onto the road), you live in the main house as your sole or main residence, and you notify the council 14 days before work starts. Building Control still applies in full, because a garden home is a new dwelling. We confirm your site at a free visit.
Does my existing shed count towards the 45 m²?
Yes. The 45 m² cap counts the garden home together with anything already built in the same rear garden under Class 3 — sheds, garden rooms, home offices. With a 10 m² shed, the garden home can be up to 35 m². The home itself must still be at least 32 m², so a shed of more than 13 m² would need to come down first.
How close to the boundary can it go?
At least 0.6 m from any boundary wall or party boundary, and any window must be at least 0.6 m from the boundary it faces. Fire-safety rules on walls and windows close to a boundary can push it further in, so we treat 0.6 m as a minimum, not a target, and design around both.
My house has a septic tank. Can I still build one?
Often, yes. If the house uses a septic tank or treatment system, the garden home must not encroach on the percolation area, the existing system must have capacity for the extra load to the EPA Code of Practice, and no new treatment unit may be added. We check the percolation area and the system at the free site visit.
I live in a terraced house. Is a garden home possible?
It depends mostly on access and space. You still need at least 25 m² of garden left over and 0.6 m to every boundary. You cannot create a new gate or entrance onto a road (condition 10), and the garden home needs its own pedestrian access within your property (condition 11). An existing rear gate or laneway access can help; where the only way into the back garden is through the house, we check your layout against condition 11 at the free site visit. For the build itself, our on-site ICF pour doesn't need a crane, so tight access is often workable.
Do I have to tell the council?
Yes. A notification goes to your planning authority at least 14 days before work starts, saying you are using Class 3A, confirming the site meets the conditions, giving the reason for the garden home, and including the location and Eircode. It is free, and there is no application to decide: the council records it. The council forms include a declaration (sole or main residence, no sale or short-term letting) that only the owner can make, so the owner signs; an agent can prepare and lodge it. It is separate from the building control Commencement Notice (below), and we prepare and lodge both for you; you sign them as the owner. Every council’s form and address is in our Class 3A notification guide, linked below.
Do I need a Commencement Notice for a garden home?
Yes. A Class 3A garden home is a new dwelling, so full building control applies: a Commencement Notice with compliance documents is lodged on the Building Control Management System (BCMS) 14–28 days before work starts, with a design certifier, an assigned certifier and a competent builder, and a Certificate of Compliance on Completion must be registered before anyone moves in. The owner registers on BCMS and signs the Commencement Notice. The BCMS fee is €30. Lodge the Commencement Notice first (Kildare asks for its BCMS number on the notification), then send the council notification the same day. Work can start at least 14 days after both, and within 28 days of the Commencement Notice.
Will the exemption change?
When the Government approved the garden home exemption in April 2026, ministers said it would be reviewed within 18 months. Nobody can say yet what a review will change. What is fixed in law today: S.I. No. 340/2026 runs until 31 December 2030, and a garden home must be both started and finished inside that window.
Fixed prices
Costs
How much does a garden home cost?
Our garden homes are fixed-price: €93,900 + VAT @ 13.5% for the 33 m² 1 Bed Granny Flat, €126,500 + VAT @ 13.5% for the 45 m² 1 or 2 Bed Granny Flat and €134,500 + VAT @ 13.5% for the 48 m² 2 Bed Granny Flat, including design, build and full project management. The 25 m² Garden Studio, a garden room rather than a home, is €69,000 + VAT @ 13.5%.
What isn't included in the price?
Site works, connections and professional fees. They depend on your garden, so we quote them after your free site visit, before you commit to anything.
How do payment stages work?
Your payment stages are set out in your fixed-price quote, so you see them before you commit to anything. You get drawings and one fixed price. No surprise variations once the pour starts.
Class 3 garden room
The Garden Studio
Can I live or sleep in the Garden Studio?
No. At 25 m² it is below the 32 m² Class 3A minimum, so it is sold as a garden room under Class 3 (S.I. No. 338/2026). It is for use with your home — an office, studio, gym or hobby room — and cannot be lived in or slept in without planning permission.
Does the Garden Studio need planning permission?
Usually not. Garden structures behind your house need no planning permission if, together with any existing sheds, they total no more than 30 m², leave at least 25 m² of garden, and stay under 3 m high (4 m with a tiled or slated pitched roof). It must not sit forward of the front wall of the house. We confirm it at your free site visit.
Can I have a Garden Studio and a garden home?
Not both under the exemptions. A 25 m² Garden Studio counts towards the 45 m² Class 3A limit, leaving 20 m² — below the 32 m² minimum for a garden home. A garden home alongside it would need planning permission, which we can handle.
Does the Garden Studio need a council notification or a Commencement Notice?
No. The Garden Studio is a Class 3 garden room, not a dwelling. It is not built under Class 3A, so neither the Class 3A notification nor the new-dwelling building control process (Commencement Notice, certifiers and completion certificate) applies to it. We confirm what applies to your site at your free site visit.
Announced in Budget 2027 — subject to the Finance Act and Revenue guidance
Renting it out
Can I rent out a garden home?
For longer stays, yes — never as a short-term let (Class 3A condition 19). The garden home stays occupied together with the main house, cannot be sold separately, and you must live in the main house. Rent-a-Room relief is built around licence arrangements: the person living in the garden home is a licensee, like a lodger, not a tenant.
Does Rent-a-Room relief apply to garden homes?
Budget 2027 (6 October 2026) extended Rent-a-Room relief to new detached garden homes of 32–45 m² built under Class 3A, backdated to 27 July 2026. The tax-free annual limit rises from €14,000 to €16,000 from 1 January 2027. If your gross Rent-a-Room income for the year goes over the limit, even by €1, the whole amount becomes taxable, not just the part over the limit. Announced in Budget 2027 and subject to the Finance Act and Revenue guidance, which will set out exactly who qualifies and on what conditions. This is general information, not tax advice — your accountant can confirm how it applies to you.
Which sizes can qualify for Rent-a-Room relief?
As announced, the relief covers new 32–45 m² Class 3A garden homes: the 33 m² 1 Bed Granny Flat and the 45 m² 1 or 2 Bed Granny Flat, subject to site eligibility. The 48 m² 2 Bed Granny Flat is outside that band. The Garden Studio does not qualify: it is a Class 3 garden room, not a dwelling, and cannot be lived or slept in.
Loans and grants
Paying for it
Is there a grant for building a granny flat?
There is no grant for building a garden home or granny flat. SEAI home energy grants are for upgrading existing homes — the solar PV and heat pump grants need a home built and occupied before 2021 — so a new garden home does not qualify. The Housing Adaptation Grants are the ones to ask your council about. These are means-tested grants run by your local council for adapting a home. The council decides whether a new detached garden home qualifies, and no grant is paid for works that start before approval — ask your council before you sign anything.
How do people pay for a garden home?
From savings, or by borrowing: mortgage top-up or equity release; credit union loan; personal loan. We don't publish interest rates or recommend lenders — talk to your own lender, credit union or an independent financial adviser.
Could the Housing Adaptation Grant help?
Possibly — ask your council. Housing Adaptation Grant for People with a Disability up to €40,000; Housing Aid for Older People up to €10,700; Mobility Aids Grant up to €8,000. These are means-tested grants run by your local council for adapting a home. The council decides whether a new detached garden home qualifies, and no grant is paid for works that start before approval — ask your council before you sign anything.
On site
The build
How long does the build take?
The on-site structural build takes 5–10 days once foundations are ready. Design, the 14-day council notification (or planning permission), the building control Commencement Notice and connections add lead-time before that, and we project manage the whole sequence.
What warranty do I get?
Your fixed-price quote sets out the structural warranty. You receive your warranty documents with your keys at handover, once the Certificate of Compliance on Completion is registered.
Who will I deal with, and who builds it?
You deal with Nua Living throughout: one point of contact from your first call to handover. Primestructures’ own crew builds every home, with 10 years of ICF construction behind them.
BER and nZEB
Energy
What BER will my garden home have?
Designed to BER A0, the top of SEAI’s new scale. A0 is a design target, not a certificate: the Department’s guidance says a BER is not legally required for a standalone building under 50 m². We can arrange a BER assessment if you want one. Every new Irish home, ICF or timber frame, must meet the same nZEB standard under Part L, including walls of 0.18 W/m²K or better and an airtightness test.
Do I need a BER for my garden home?
Not by law. The Department’s guidance says a BER is not legally required for a standalone building under 50 m². The building control process still applies in full, because a garden home is a new dwelling. We can arrange a BER assessment if you want one.
Is ICF more energy efficient than timber frame?
Every new Irish home, ICF or timber frame, must meet the same nZEB standard under Part L (TGD L 2022), including walls of 0.18 W/m²K or better and an airtightness test, so against a well-built timber-frame home the difference is modest and depends on design. ICF adds continuous insulation on both sides of a concrete core: NSAI-certified ICF wall systems reach about 0.10–0.25 W/m²K depending on insulation thickness. A peer-reviewed UK study (Mantesi et al., Energy and Buildings, 2019) found the concrete core cut wall heat loss compared with a lightweight wall with the same insulation, and a controlled US field test (NAHB Research Center for HUD, 1999) found ICF homes used about a fifth less heating energy than a timber twin, mainly because their walls were better insulated. Nua Living homes are designed to BER A0 on SEAI’s new scale, as a design target; a BER is not legally required for a standalone building under 50 m², and we can arrange a BER assessment on request.
Still have a question?
Call 089 453 2374, or check your garden online and we'll confirm everything at a free site visit.
*Design target, not a certificate: a BER is not legally required for a standalone building under 50 m², and we can arrange a BER assessment on request. A0 = 42 kWh/m²/yr or less primary energy plus SEAI zero-emission criteria (scale in force from 24 May 2026).